Image Lens Accessories Mold, High Temperature Mold,
HomeHome > Products > Plastic Product > Image Lens Accessories Mold, High Temperature Mold,
Image Lens Accessories Mold, High Temperature Mold,

Image Lens Accessories Mold, High Temperature Mold,

Overview Package Size 70.00cm * 70.00cm * 65.00cm Package Gross Weight 700.000kg Product Description Plastic Mold Factor
Overview
Basic Info.
Model NO. OY23-13
Mould Cavity Single Cavity
Plastic Material PA66+GF
Process Combination Type Progressive Die
Application Car, Household Appliances, Furniture, Commodity, Electronic, Home Use, Hardware
Runner Cold Runner
Design Software UG
Installation Semi Fixed
Certification ISO
Standard DME
Customized Customized
After-sales Service 3years
Part Material ABS/PP/POM/PA6/PE/PMMA and etc.
Sample Verification 3D Printing
Mould Life 0.5-1 Million
Mold Design Design Review
Transport Package Wooden Box
Specification 65cm*70m*70cm
Origin Changzhou, China
HS Code 8480719090
Production Capacity 300pieces/Year
Packaging & Delivery
Package Size 70.00cm * 70.00cm * 65.00cm Package Gross Weight 700.000kg
Product Description
Product Description

Plastic Mold Factory Professional Mould Suppliers Custom OEM ODM ABS PP PE PS PA PC TPU Hot/Cold Runner Over Mould Injection Mold

The capabilities of the factory
Main services 3D /2D design, Prototypes, Mold design, Mold making, Mold testing,
Low volume/ High volume plastic injection production
Production processDetailed contentCycle of time
Design Software UG, Pro E Solidwork, AutoCAD, Moldflow ...
Product designAccording to customer requirements, product design, or customer design concept, we complete the product designProduct design typically takes between 3 and 8 days.
Sample verification: 3D printing CNC2-15 days
Mold analysis and Product analysisDFM Mode flow analysis2-7 days
Mold design √ Design review 2-7 days
The material of Mold H13, 738H, √ 2738, NAK80, S136, etc3-7 days
Mold base LKM Futaba HASCO ,DME7-15 days
Machining and Dimensional measurementDeep hole drill1-3 days
Medium wire cutting √ Slow wire cutting1-4 days
cnc1-5 days
Electric spark 1-3 days
simi fited 3-13 days
polishing1-3 days
Surface etching1-7 days
Die trial production Supplier's responsibility1-3 days
Dimensional measurement and Trial assemblyTwo-dimensional and coordinate measuring instrument 1-3 days
Time of mold completion According to the complexity of the mold, the customer's delivery requirements to determine the mold completion time
Plastic productionplastic Injection Machine: 128T 168T 208T 320TAccording to the complexity of the mold, the customer's delivery requirements to determine the mold completion time. Generally, the completion time is 30-60 days

Our company strictly in accordance with the following product design and development process and mold development process to carry out product design and mold production:

Image Lens Accessories Mold, High Temperature Mold,

Detailed PhotosOur Advantages

Our team utilizes the most current and sophisticated technology and equipment in the mold making process, create world class toolingat competitive prices with short lead time.

-CAD/CAM/UG Software

-Mold Flow Analysis

-Mirror EDM Machines

-Precision CNC Machines

-Milling and Drilling Machines

-Grinders

-Engraving/Texture
Mould Trade Process

1. QuoteAccording to sample, drawing and specific requirement.
2. DiscussionMold material, cavity number, price, runner, payment, etc.
3. S/C SignatureApproval for all the items
4. AdvancePay 50% by T/T
5. Product Design CheckingWe check the product design. If some position is not perfect, or can not be done on the mould, we will send customer the report.
6. Mould DesignWe make mould design on the basis of confirmed product design, and send to customer for confirmation.
7. Mold ToolingWe start to make mold after mold design confirmed
8. Mold ProcessingSend report to customer once each week
9. Mold TestingSend trial samples and try-out report to customer for confirmation
10. Mold ModificationAccording to customer's feedback
11. Balance settlement50% by T/T after the customer approved the trial sample and mould quality.
12. DeliveryDelivery by sea or air. The forwarder can be designated by your side.
Company ProfileChangzhou Ouyuan Safety Protection Articles Co., Ltd. Was established on May 10, 2023. Its business scope includes the manufacturing, processing, sales and research and development of special labor protection articles (helmets, gas mask, respirators, filters, protective clothing, protective shoes (boots), impact eye protectors), silicone rubber parts, plastic parts, mechanical parts, molds, etc.CertificationsWhy choose us?

A) Before Sales Service

  • 24hours online service
  • Sample support
  • Detailed technical 2d and 3d drawing design
  • Free pick up at hotel/aitport to visit Vida factory
  • Quickly and professional response on quotation and technology

B) Production Period Service

  • Technical 2d and 3d drawing submit to double check details and discussion
  • Quality inspection report submit,guarantee the accuracy
  • Installation solution and maintenance instruction

C) After Sales Service

  • Provide the usage advice and Guide, remote assistance
  • 18 monthes quality Warranty
  • Any quality problems replace freely
FAQQ1. What is the accuracy of the products processed by the drawings?
  • Different equipment has different accuracy, generally between 0.01-0.10
Q2.What craftsmanship do you have for processing accessories?
  • According to different products, different processes are used, such as machining, extrusion, injection molding, etc.
Q3. What are your processing equipment?
  • CNC machining center, CNC lathe, milling machine, engraving machine, injection molding machine.
Q4. Can you offer assembling Service?
  • Yes, we can offer assembling service in our 100,000 class clear room.
Q5.What is the payment term?
  • Delivery Terms:FOB,CFR,CIF,EXW
  • Payment Currency:USD,EUR,CNY
  • Payment Terms:T/T,L/C,Paypal etc.